Customization: | Available |
---|---|
After-sales Service: | Debugging,Repair,Replacement of Parts |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Using multi stage hydrocyclones for concentrating, the advanced process design assure the extraction rate more than 92%
2. Low water consumption
It needs 5- 8 tons of water for each ton starch, much less than those traditional equipments which need 15 - 25 tons water.
3. Large in capacity
4. Closed system
All equipments and tanks are closed, they are connected by pipelines, there is no open device so that it can ensure that the production line has good performance and a clean and hygienic environment.
5. Fully automated design
It can save time and labor power, meanwhile the quality of the product produced is also guaranteed, such as the online cleaning function, it can make whole production system cleaned completely.
Model | Input Capacity (ton per hour) |
Y | Capacity can be customized ( 3 t/h to 180 t/h) |
SUCH AS | |
Min Input | 3t/h |
Max Input | 180t/h or more |
The Line can be designed according to the processing capacity of customers' needs |
Q:Are you a trade company or a manufacturer?
A:We are a manufacturer, and welcome to visit our factory and check the machines.
Q:How long is your delivery time?
A:Generally it is 10days when goods are in stock, or it is 35days if the goods are not in stock. We could discuss before contract.
Q:Could you supply all the parameters about the machines?
A:Yes, We will supply all the parameters, price layout drawing, factory desion etc.
Q:What is your terms of payment?
A:30% T/T in advance , 70% balance before shipment after in spection.
Q:How about the after-service?
A:We will send engineers to the buyer's factory for 7-14 days period installation and training to the operatiors.
Q:Do you supply any formula to buyer?
A:Yes, we supply formulas to buyer.